top of page
ambierle-11x5-646-910x468-1.png

Why Choose Desjoyaux In Cyprus

With over 1600 pools built in Cyprus over the last 30 years, we have the experience!

open garden pool

Desjoyaux Pool and Play

Built For Cyprus 

  • Fast Installation – No complicated plumbing = completion typically in 10 working days, not months.

  • Eco-Friendly – Saves up to 80% more water than traditional pools.

  • Perfect for the Climate – Heat-resistant, algae-resistant design

Desjoyaux

Step By Step Installation Process

  • Site Preparation – Minimal groundwork required.

  •  Structural Installation – The modular system is assembled.

  •  Filtration System Setup – No pipes, just efficient water circulation.

  • Final Touches – Liner, decking, and accessories added.

  •  Ready to Swim! – Fast installation, long-lasting results.

site preparation before building a garden pool

Contact us

young lady in a pool
bottom of page